Previous Topic

Next Topic

Book Contents

Book Index

Hold-down Design

Important Note – These are descriptions to changes implemented in WoodWorks Shearwalls for version 9 and may not reflect current behavior.

  1. Hold-down Location

    The program performs the design check for hold-down capacity at each wall or opening end.

    1. Vertical elements

      There is currently no mechanism for entering hold-downs at the base of vertical elements transferring a force from an upper story via a vertical element to a location on a lower story that is not a wall or opening end on that story. so is no hold-down design for those hold-down locations.

  2. Design Cases

    For each design case (wind, seismic, and both force directions), the program checks the ASD capacity of the hold-downs at each hold-down location against the combined ASD factored uplift force. The combined force includes:

  3. Design Method

    This is a design check only on a hold-down selected for the hold-down location. The program does not at this time cycle through various possibilities to find a hold-down.

See Also

Hold-down Connections

Hold-down Types and Properties

Hold-down Database Editor

Hold-down Input

Hold-down Settings

Output

Hold-down Database