The Getting Started dialog has been updated to reflect the current state of the program. The text shown for Roofs and Generate Loads has been changed and a new step, Step 14, Log File Output, has been added.
See Also
Versions 8.3 and 8.31
Component and Cladding (C&C) Design
Wind Load Generation
Load Distribution
Seismic Load Generation Input Typos (Change 121)
Apply Load Change Message (Change 119)
Restriction of Shearwall Materials when All Segments have Hold-downs (Bug 2625)
Directionality of Uplift Wind Loads (Bug 2638)
Serviceability vs. Ultimate Limit States in Table Legends (Bug 2641)
Uplift Forces Shown in Hold-down Displacement Table (Bug 2641)