When cycling through the number of plies for a built-up beam, the program did not apply the KH system factor as per CSA 086 5.4.4.3. As a result, the program sometimes recommends a larger number of plies than are actually needed. This factor was applied when the design check is done. This has been corrected and the system factor is now part of the design search for built-up beams.