Previous Topic

Next Topic

Book Contents

Book Index

Design Cancel (Change 100)

Fixed “Cancel” of design such that it cleans up the what it is doing on the current floor and then exits. Previously it was doing large amounts of unnecessary processing, and the box would freeze on the screen, but not do anything or affect the program.

See Also

Other Engineering Design Issues

Shear Strength of Unblocked Shearwall (Bug 2250)

Gypsum Wall Board for Wet Service Conditions (Bug 2251)

Segment Output in Seismic Shear Results Table (Bug 2275)

Gypsum Wallboard Storey Capacity for One Directional Loading (Bug 2273)

Percent Gypsum Shear for Asymmetric Wind Loads (Bug 2264)